Duke Energy Works with N.C. Solar Installers on Gradual Internet Metering Transition

Duke Energy has reached an settlement with solar installers in North Carolina to assist its authentic submitting with some modifications. The stipulation gives a gradual transition possibility from the prevailing internet metering applications for eligible clients, whereas creating extra future advantages for all of Duke Energy’s clients. The compromise resolution reached represents a collaborative effort to account for a broad vary of pursuits. This bridge price will create an orderly transition possibility for patrons and assist the enterprise efforts of the solar installer group.

“As for the Proposed Bridge Rate, it would be offered as a limited alternative to the time-of-use tariffs proposed in the Companies’ Application,” the submitting reads. “This alternative rate option would be open to existing and eligible new customers who apply for this option through December 31, 2026, subject to annual capacity caps. Customers electing to take service on the Proposed Bridge Rate may do so for up to 15 years, subject to certain limitations outlined in the Stipulation.”

“The Proposed Bridge Rate includes monthly netting at the applicable avoided cost rate and includes the same monthly minimum bill (MMB) and non-bypassable charge that are included within the NEM tariffs proposed in the Companies’ Application,” the stipulation continues. “However, the Proposed Bridge Rate does not include a grid access fee or mandatory time-of-use rates. The following customers would be exempted from the MMB under the Proposed Bridge Rate: Homes specifically built for low-income and vulnerable customers (e.g., Habitat for Humanity), LIHEAP recipients, and CIP recipients. The Stipulation includes additional provisions that aim to create benefits to all customers above and beyond the alternative NEM rates outlined above – ranging from additional consumer protection measures to collaboration on the valuation of distributed energy resources.”

“Taken as a whole, the Stipulation provides a gradual transition option from the existing NEM programs for eligible customers, while creating additional future benefits for all of the Companies’ customers,” the submitting concludes. “The compromise solution reached by the Stipulating Parties represents a collaborative effort to account for a broad range of interests, while also adhering to the NEM directives and timelines within House Bill 589. The Stipulating Parties are encouraged by this progress and look forward to collaborating on these matters going forward.”

Read the total stipulation right here.

Recent Articles

AEE Solar opens new distribution heart in Visalia, Calif.

By SB Staff September 25, 2023 Since 1979, AEE Solar has grown from a storage in Redway, Calif., to...

QUICK TIP for SOLAR POWERED WATER FOUNTAIN HOW TO FILTER WITH NO FILTER

KEEP YOUR PUMP CLEAR FROM JUNK. Solar power pump will last more. Watch the complete video to search out out this fast tip to...

The function of glass – solar glass – in assembly world local weather objectives

By Contributing Author September 20, 2023 This was submitted by Mikhail Vasiliev, lead scientist at ClearVue Technologies, a smart-building...

Indonesia begins work on Southeast Asia’s largest floating solar plant

Construction on Indonesia's first floating solar power plant is below manner. The facility is anticipated to power greater than 50000 properties.

Related Stories

Leave A Reply

Please enter your comment!
Please enter your name here

Stay on op - Ge the daily news in your inbox